1. KEY LEGAL BASES
– Laws & Resolutions: Law on Environmental Protection No. 72/2020/QH14; Law No. 146/2025/QH15 amending 15 laws in agriculture and environment; Resolution No. 66.19/2026/NQ-CP on administrative simplification and decentralization under the Ministry of Agriculture and Environment.
– Decrees & Circulars: Decree No. 08/2022/ND-CP, Decree No. 48/2026/ND-CP; Circular No. 02/2022/TT-BTNMT, Circular No. 07/2025/TT-BTNMT, Circular No. 09/2026/TT-BNNMT; Decree No. 45/2022/ND-CP on administrative sanctions in environmental protection.
2. 04 CORE ENVIRONMENTAL PROCEDURES
| Criteria | Preliminary EIA | Environmental Impact Assessment | Environmental License | Environmental Registration |
| Concept | Identification of key environmental issues during pre-feasibility study or project proposal stage. | Comprehensive analysis, forecast of environmental impacts, and mitigation measures. | Legal permit authorizing waste discharge and waste management under statutory environmental conditions. | Mandatory registration of waste discharge and environmental protection commitments with authorities. |
| Target Entities | Group I investment projects only (high pollution risk, environmentally sensitive, large-scale resettlement). | • All Group I projects.
• Group II projects with environmentally sensitive factors. (Streamlined under Res. 66.19). |
Group I, II, and III projects generating wastewater/exhaust gas reaching regulated thresholds; scrap importers; hazardous waste treaters. | Projects/establishments generating waste that are exempt from obtaining an Environmental License. |
| Timing of Execution | Pre-feasibility study phase; prior to in-principle investment approval. | Project preparation phase; prior to project approval or construction licensing. | • Projects subject to EIA: Before trial operation.
• Projects exempt from EIA: Before construction licensing or operation. |
• Projects subject to EIA: Before official commercial operation.
• Projects exempt from EIA: Before construction licensing or discharge. |
| Key Contents | Planning compliance, sensitive factors, preliminary analysis of technology, scale, and location. | Baseline environmental survey, waste load assessment, mitigation facilities, community consultation. | Permitted discharge flow rates, pollutant limits, applicable standards, monitoring requirements. | Production scale, type/volume of waste generated, self-treatment measures, and commitments. |
| Competent Authority | –
|
• Ministry of Agriculture & Environment (MAE): Large, inter-provincial, or high-risk projects.
• Provincial People’s Committee: Majority of remaining projects. |
• MAE: Scrap import, inter-provincial hazardous waste management.
• Provincial People’s Committee: Most local investment projects. |
• Provincial PPC: Wastewater or exhaust gas .
• Commune-level PPC: Below the above thresholds. |
| Validity / Timeframe | –
|
Valid throughout project life (updated/superseded if phased). | 07 years (Group I) or 10 years (others); Expedited online issuance: 15 working days. | Retains full legal validity and recorded in the National Environmental Database. |
3. KEY REFORMS FOR ENTERPRISES
– Comprehensive Decentralization to Provincial Authorities: Broad delegation of EIA appraisal and Environmental License issuance powers from the Ministry down to the Chairperson of the Provincial People’s Committee.
– Flexible Integration and Segregation Mechanism: Projects by the same investor, at the same location, or sharing waste treatment facilities can be integrated into a single Environmental License; phased projects can prepare EIAs stage by stage.
– Fast-track Online Procedure: Licensing turnaround reduced to only 15 working days via public administrative portals for projects not requiring trial operation of waste treatment facilities.
4. COMMON ADMINISTRATIVE SANCTIONS (Decree No. 45/2022/ND-CP)
– Failure to conduct EIA: Fines from VND 150,000,000 to 250,000,000; suspension of project construction for 06 to 12 months.
– Operating without an Environmental License: Fines from VND 30,000,000 to 220,000,000; suspension of waste discharge activities for 03 to 06 months.
– Illegal waste discharge / Bypassing treatment facilities: Fines from VND 400,000,000 to 1,000,000,000; revocation of the license or operational suspension up to 12 months.
– Failure to complete Environmental Registration: Fines from VND 3,000,000 to 30,000,000 depending on the project’s corresponding EIA approval tier.